2012 Moon - under repair and rebuilding  
StartMeny Album MiniAlbum Previous Next
The deck around a chain plate.

Two layers of plywood and water trapped in between.
Drilled holes through the top layer to dry it out.
Once again the moister meter is a fantastic help do be able to determine when the plywood is dry enough for epoxy repair.